You can see from the above plan of the garden how the electricity
has to be redone. I need to run 16mm armoured cable
all the way up the garden.
(a) it has to go under the floor of the house and under the patio
to the freezer room where it will terminate and be split
(b) from the freezer room a feed will go to the new garage and a feed will
go up to the summerhouse in the naturist area
(c) from the summerhouse a feed will go to the existing garage - the
cable for this section has now been laid
(d) from the garage a feed will go to the shed and will feed the pool
I have the 16mm armoured cable and I have also bought the BCCI MultiPlus
for the outside lighting in the naturist area. Once
I get the armoured cable laid I will need to go an buy the termination and
distribution units for the various buildings (and then,
of course, there is the matter of sockets and lights etc in the buildings...)
The priorities have also changed. The plan above shows:
(1) this is the new garage. Priority is to get the building up so
that I can at least get my car under cover again. The garage is now
up and functional. I'll paint it and equip it later. That can
wait
(2) also urgent now is to get the electrics in place - I've made a start
at least
(3) swimming pool - has now been ordered
(4) sauna - this has been waiting for a long time but will have to wait
a while longer
(5) pergola alongside the naturist area - I'll mount lights on this.
There are also many other jobs:
panel the shed interior
finish fitting out the summerhouse
electrics in the buildings
equip the new garage ...
|